<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Arhive Feasibility Studies - Ecoapa Design</title>
	<atom:link href="https://ecoapa.ro/en/portfolio_cat/feasibility-studies/feed/" rel="self" type="application/rss+xml" />
	<link>https://ecoapa.ro/en/portfolio_cat/studii-de-fezabilitate-en/</link>
	<description>Proiectare modernă, soluții de actualitate</description>
	<lastBuildDate>Mon, 09 Dec 2024 08:21:45 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.7.2</generator>

<image>
	<url>https://ecoapa.ro/wp-content/uploads/2024/12/cropped-Icon-Ecoapa-32x32.png</url>
	<title>Arhive Feasibility Studies - Ecoapa Design</title>
	<link>https://ecoapa.ro/en/portfolio_cat/studii-de-fezabilitate-en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Technical assistance for the preparation of the funding application, revision of supporting documentation, and preparation of tender documents for the regional project for the development of water and wastewater infrastructure in Neamț County during the 2014-2020 period.</title>
		<link>https://ecoapa.ro/en/portfolio/the-regional-project-for-the-development-of-water-and-wastewater-infrastructure-in-neamt-county/</link>
		
		<dc:creator><![CDATA[3c04p4]]></dc:creator>
		<pubDate>Tue, 03 Dec 2024 20:12:18 +0000</pubDate>
				<guid isPermaLink="false">https://ecoapa.ro/portfolio/asistenta-tehnica-pentru-pregatirea-aplicatiei-de-finantare-revizuirea-documentatiei-suport-sl-pregatirea-documentatiilor-de-atribuire-pentru-proiectul-regional-de-dezvoltare-a-infrastructurii-de-apa/</guid>

					<description><![CDATA[<p>Articolul <a href="https://ecoapa.ro/en/portfolio/the-regional-project-for-the-development-of-water-and-wastewater-infrastructure-in-neamt-county/">Technical assistance for the preparation of the funding application, revision of supporting documentation, and preparation of tender documents for the regional project for the development of water and wastewater infrastructure in Neamț County during the 2014-2020 period.</a> apare prima dată în <a href="https://ecoapa.ro/en/">Ecoapa Design</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row cstportpad1 row-container" id="row-unique-0"><div class="row double-top-padding double-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light sticky-element sticky-sidebar"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_row row-internal row-container desktop-hidden"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 no-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="owl-carousel-wrapper">
		
	<div class="owl-carousel-container owl-carousel-loading px-gutter" >
									<div id="gallery-145293" class="owl-carousel owl-element owl-height-auto" data-loop="true" data-navmobile="false" data-navspeed="400" data-autoplay="true" data-timeout="5000" data-stagepadding="0" data-lg="1" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-middle tmb-overlay-text-left tmb-id-146185  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 66.7%;"></div><a tabindex="-1" href="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County.jpeg" class="pushed" data-active="1" data-lbox="ilightbox_gallery-145293" data-external-thumb-image="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-150x150.jpeg" data-lg-size="1484-767" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img fetchpriority="high" decoding="async" class="wp-image-146185" src="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-uai-1150x767.jpeg" width="1150" height="767" alt="Technical assistance for the funding application and documentation for the regional water and wastewater project in Neamț, 2014-2020." srcset="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-uai-1150x767.jpeg 1150w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-uai-720x480.jpeg 720w" sizes="(max-width: 1150px) 100vw, 1150px" /></a></div>
					</div>
				</div></div></div>			</div>
					</div>

	
	
</div>

<div class="uncode-owl-nav-wrap"><div class="uncode-owl-nav-out skin-inherit"><div class="uncode-owl-nav carousel-nav-192415-custom cstpeowlnav dots-look-default pos-rel h-align-center owl-nav-no-block-padding dots-lines h6 font-weight-500 no-width" data-target="#gallery-145293" data-dots="lines"><div class="uncode-owl-nav-in uncode-owl-nav-waiting"><div class="uncode-owl-nav-safe" ><span class="uncode-nav-limit-before"></span><span class="uncode-nav-dots"></span><span class="uncode-nav-limit-after"></span></div></div></div></div></div></div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container tablet-hidden mobile-hidden"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div id="gallery-1451932" class="isotope-system isotope-general-light grid-general-light">
					
	<div class="isotope-wrapper grid-wrapper half-gutter" >
									<div class="isotope-container isotope-layout style-masonry" data-type="masonry" data-layout="masonry" data-lg="1000" data-md="600" data-sm="480">
<div class="tmb tmb-iso-w12 tmb-iso-h4 tmb-light tmb-overlay-middle tmb-overlay-text-left tmb-id-146185  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 51.7%;"></div><a tabindex="-1" href="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County.jpeg" class="pushed" data-active="1" data-lbox="ilightbox_gallery-1451932" data-external-thumb-image="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-150x150.jpeg" data-lg-size="1484-767" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-146185" src="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County.jpeg" width="1484" height="767" alt="Technical assistance for the funding application and documentation for the regional water and wastewater project in Neamț, 2014-2020." srcset="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County.jpeg 1484w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-300x155.jpeg 300w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-1024x529.jpeg 1024w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-768x397.jpeg 768w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-350x181.jpeg 350w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Neamt-County-uai-720x372.jpeg 720w" sizes="(max-width: 1484px) 100vw, 1484px" /></a></div>
					</div>
				</div></div></div>			</div>
					</div>

	
	
</div>

</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 cstportpad2 single-internal-gutter"><div class="uncol style-light sticky-element sticky-sidebar"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_custom_heading_wrap "><div class="heading-text el-text" ><h2 class="font-846016 h4 fontheight-357766" ><span>Feasibility Studies</span></h2></div><div class="clear"></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 half-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="divider-wrapper "  >
    <hr class="border-color-105898-color separator-no-padding"  />
</div>
<div class="uncode-wrapper uncode-portfolio-details" ><p><span class="detail-container"><span class="detail-label">Value</span><span class="detail-value">7,050,000.00 RON, excluding VAT</span></span><span class="detail-container"><span class="detail-label">Consultant</span><span class="detail-value">The Association of Protoby & Ecoapa Design SRL</span></span><span class="detail-container"><span class="detail-label">Beneficiary</span><span class="detail-value">Neamț County Apaserv Company</span></span></p></div><div class="divider-wrapper "  >
    <hr class="border-color-105898-color separator-no-padding"  />
</div>
</div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 half-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column" ><p>The objective of this contract is the preparation of documentation for securing funding for the Regional Investment Project aimed at increasing the level of urban wastewater collection and treatment, as well as the degree of potable water supply for the population of Neamț County.</p>
<p>Within this service contract, technical documentation was prepared for investments in potable water infrastructure and wastewater collection and treatment infrastructure in 42 Administrative Units in Neamț County, namely: Piatra Neamț Municipality, Roman Municipality, Bicaz Town, Roznov Town, Târgu Neamț Town, and the Communes: Agapia, Alexandru cel Bun, Bălțătești, Bârgăuani, Bîra, Bodești, Brusturi, Costișa, Dobreni, Dochia, Dragomirești, Dumbrava Roșie, Gârcina, Girov, Grumăzești, Horia, Mărgineni, Pângărați, Păstrăveni, Piatra Șoimului, Pipirig, Podoleni, Răucești, Războieni, Rediu, Români, Ruginoasa, Săbăoani, Săvinești, Ștefan cel Mare, Tămășeni, Tarcău, Tașca, Țibucani, Tupilați, Urecheni, and Zănești.</p>
<p>The main outcomes targeted through promoting investments in the water and wastewater sectors are fulfilling commitments deriving from European directives regarding:</p>
<ul>
<li>Quality of water intended for human consumption (Directive 98/83/EC) &#8211; public drinking water supply services, microbiologically controlled, safe, and health-protective, extended to populations in localities with over 50 inhabitants.</li>
<li>Wastewater treatment (91/271/EEC) &#8211; urban wastewater collected and treated (in terms of biodegradable organic load) for agglomerations with populations between 2,000 &#8211; 10,000 equivalent inhabitants (PE).</li>
</ul>
<p>The investments were based on the Master Plan approved by the Neamț County Council in 2014, which identified 23 water supply systems and 9 agglomerations that need to comply with the provisions of European Directives on water supply, wastewater treatment, and collection. However, due to budget constraints and a study conducted by the World Bank experts &#8211; SIPOCA 588, the current programming stage (POIM 2014 &#8211; 2020) includes 12 water supply systems and 6 agglomerations for wastewater treatment and collection.</p>
</div></div></div></div></div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div>
</div><p>Articolul <a href="https://ecoapa.ro/en/portfolio/the-regional-project-for-the-development-of-water-and-wastewater-infrastructure-in-neamt-county/">Technical assistance for the preparation of the funding application, revision of supporting documentation, and preparation of tender documents for the regional project for the development of water and wastewater infrastructure in Neamț County during the 2014-2020 period.</a> apare prima dată în <a href="https://ecoapa.ro/en/">Ecoapa Design</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Support for the preparation of the funding application and tender documentation for the regional project for the development of water and wastewater infrastructure in Vrancea County &#8211; Stage III, during the 2021-2027 period</title>
		<link>https://ecoapa.ro/en/portfolio/support-for-the-preparation-of-the-funding-application-and-tender-documentation-for-the-regional-project-for-the-development-of-water-and-wastewater-infrastructure-in-vrancea-county-stage-iii/</link>
		
		<dc:creator><![CDATA[3c04p4]]></dc:creator>
		<pubDate>Mon, 02 Dec 2024 06:32:23 +0000</pubDate>
				<guid isPermaLink="false">https://ecoapa.ro/portfolio/sprijin-pentru-pregatirea-aplicatiei-de-finantare-si-a-documentatiilor-de-atribuire-pentru-proiectul-regional-de-dezvoltare-a-infrastucturii-de-apa-si-apa-uzata-din-judetul-vrancea/</guid>

					<description><![CDATA[<p>Articolul <a href="https://ecoapa.ro/en/portfolio/support-for-the-preparation-of-the-funding-application-and-tender-documentation-for-the-regional-project-for-the-development-of-water-and-wastewater-infrastructure-in-vrancea-county-stage-iii/">Support for the preparation of the funding application and tender documentation for the regional project for the development of water and wastewater infrastructure in Vrancea County &#8211; Stage III, during the 2021-2027 period</a> apare prima dată în <a href="https://ecoapa.ro/en/">Ecoapa Design</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row cstportpad1 row-container" id="row-unique-1"><div class="row double-top-padding double-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light sticky-element sticky-sidebar"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_row row-internal row-container desktop-hidden"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 no-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="owl-carousel-wrapper">
		
	<div class="owl-carousel-container owl-carousel-loading px-gutter" >
									<div id="gallery-145293" class="owl-carousel owl-element owl-height-auto" data-loop="true" data-navmobile="false" data-navspeed="400" data-autoplay="true" data-timeout="5000" data-stagepadding="0" data-lg="1" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-middle tmb-overlay-text-left tmb-id-146166  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 66.7%;"></div><a tabindex="-1" href="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County.jpeg" class="pushed" data-active="1" data-lbox="ilightbox_gallery-145293" data-external-thumb-image="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-150x150.jpeg" data-lg-size="1600-900" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-146166" src="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-uai-1350x900.jpeg" width="1350" height="900" alt="Support for the funding application and documentation for the water/wastewater infrastructure project in Vrancea, Stage III, 2021-2027" srcset="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-uai-1350x900.jpeg 1350w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-uai-720x480.jpeg 720w" sizes="(max-width: 1350px) 100vw, 1350px" /></a></div>
					</div>
				</div></div></div>			</div>
					</div>

	
	
</div>

<div class="uncode-owl-nav-wrap"><div class="uncode-owl-nav-out skin-inherit"><div class="uncode-owl-nav carousel-nav-192415-custom cstpeowlnav dots-look-default pos-rel h-align-center owl-nav-no-block-padding dots-lines h6 font-weight-500 no-width" data-target="#gallery-145293" data-dots="lines"><div class="uncode-owl-nav-in uncode-owl-nav-waiting"><div class="uncode-owl-nav-safe" ><span class="uncode-nav-limit-before"></span><span class="uncode-nav-dots"></span><span class="uncode-nav-limit-after"></span></div></div></div></div></div></div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container tablet-hidden mobile-hidden"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div id="gallery-1451932" class="isotope-system isotope-general-light grid-general-light">
					
	<div class="isotope-wrapper grid-wrapper half-gutter" >
									<div class="isotope-container isotope-layout style-masonry" data-type="masonry" data-layout="masonry" data-lg="1000" data-md="600" data-sm="480">
<div class="tmb tmb-iso-w12 tmb-iso-h4 tmb-light tmb-overlay-middle tmb-overlay-text-left tmb-id-146166  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.3%;"></div><a tabindex="-1" href="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County.jpeg" class="pushed" data-active="1" data-lbox="ilightbox_gallery-1451932" data-external-thumb-image="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-150x150.jpeg" data-lg-size="1600-900" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-146166" src="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County.jpeg" width="1600" height="900" alt="Support for the funding application and documentation for the water/wastewater infrastructure project in Vrancea, Stage III, 2021-2027" srcset="https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County.jpeg 1600w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-300x169.jpeg 300w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-1024x576.jpeg 1024w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-768x432.jpeg 768w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-1536x864.jpeg 1536w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-350x197.jpeg 350w, https://ecoapa.ro/wp-content/uploads/2024/12/The-Regional-Project-for-the-Development-of-Water-and-Wastewater-Infrastructure-in-Vrancea-County-uai-720x405.jpeg 720w" sizes="(max-width: 1600px) 100vw, 1600px" /></a></div>
					</div>
				</div></div></div>			</div>
					</div>

	
	
</div>

</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 cstportpad2 single-internal-gutter"><div class="uncol style-light sticky-element sticky-sidebar"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_custom_heading_wrap "><div class="heading-text el-text" ><h2 class="font-846016 h4 fontheight-357766" ><span>Feasibility Studies</span></h2></div><div class="clear"></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 half-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="divider-wrapper "  >
    <hr class="border-color-105898-color separator-no-padding"  />
</div>
<div class="uncode-wrapper uncode-portfolio-details" ><p><span class="detail-container"><span class="detail-label">Value</span><span class="detail-value">53,029,400.00 RON, excluding VAT</span></span><span class="detail-container"><span class="detail-label">Consultant</span><span class="detail-value">The Association of Ramboll South East Europe & Ramboll Americas Engineering Solutions, Inc & Ecoapa Design SRL & Ramboll Danmark A/S</span></span><span class="detail-container"><span class="detail-label">Beneficiary</span><span class="detail-value">Focșani Public Utilities Company</span></span></p></div><div class="divider-wrapper "  >
    <hr class="border-color-105898-color separator-no-padding"  />
</div>
</div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-12 half-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column" ><p>Investments in water infrastructure for the localities in Vrancea County included in the project aimed at improving environmental quality and enhancing the living conditions of the population. Through the investments included in this project, the process of extending and rehabilitating the water infrastructure carried out during the 2014-2020 phase in urban areas continues, and investments are proposed for the extension and rehabilitation of water supply systems in rural areas and the establishment of water supply systems in rural areas that currently do not have a centralized water supply system.</p>
<p><strong>Specific Objectives:</strong></p>
<ol>
<li>Updating the Master Plan</li>
<li>Studies required at the Feasibility Study (FS) phase: Hydrogeological studies; Geotechnical studies; Topographical studies; Assessments for utility works and structures and other necessary studies</li>
<li>Complete feasibility study from a technical perspective (this will include: the technical part, general estimates and object estimates, economic-financial analysis, technical drawings, sludge strategy, industrial wastewater discharge study, institutional analysis, studies, assessments; documentation needed to obtain: environmental agreement/regulatory act issued by the competent environmental authority, ANAR approval, urbanism certificate, construction/demolition permits, approvals, and agreements, coordination plan approved by the involved authorities, funding application)</li>
<li>Documentation required for obtaining the construction permit, permits/approvals for national roads, railways (if applicable), county roads (these will include the written part, the drawing part, and any approval/study necessary for project implementation)</li>
<li>Funding application including supporting documents (supporting documents: final complete feasibility study, cost-benefit analysis, environmental impact assessment, institutional analysis, coordination plan adopted and approved by all involved authorities, approvals, agreements, etc.)</li>
<li>Technical designs</li>
<li>Tender documentation</li>
<li>Report on the support activity in evaluating the Funding Application</li>
<li>Organization of seminars/workshops and ensuring project publicity (includes: seminars/workshops to present the feasibility study to local authorities at certain stages and technical projects and publicity measures)</li>
<li>Technical assistance from the designer during the implementation of the works contracts</li>
</ol>
<p><strong>Results:</strong></p>
<ul>
<li>Ensuring compliance with specific procedures established by the applicable legislation in force, both during the development and finalization of procurement documentation and throughout the procedure until contract signing;</li>
<li>Ensuring high-quality design in compliance with all current norms and standards;</li>
<li>Providing technical assistance from the designer throughout the entire project implementation period;</li>
<li>Preparation of tender documentation, technical projects, and execution details, in accordance with national legislation, for the works contracts within the project, in compliance with the funding application and the approved feasibility study;</li>
<li>The approved project promotes concrete measures of adaptability to climate change by building sustainable infrastructure;</li>
<li>The works contracts proposed within the Project are tendered in accordance with the project implementation schedule, with the Regional Operator benefiting from support during the tendering process;</li>
<li>Seminars to present the Feasibility Study;</li>
<li>Increasing the population&#8217;s connection rate to water and wastewater systems;</li>
<li>Ensuring the continuous and quality-compliant supply of water according to current norms to all localities included in the project.</li>
</ul>
<p>
</div></div></div></div></div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div>
</div><p>Articolul <a href="https://ecoapa.ro/en/portfolio/support-for-the-preparation-of-the-funding-application-and-tender-documentation-for-the-regional-project-for-the-development-of-water-and-wastewater-infrastructure-in-vrancea-county-stage-iii/">Support for the preparation of the funding application and tender documentation for the regional project for the development of water and wastewater infrastructure in Vrancea County &#8211; Stage III, during the 2021-2027 period</a> apare prima dată în <a href="https://ecoapa.ro/en/">Ecoapa Design</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
