logo
logo
  • Romanian
  • CONTACT
  • +40746 397 023
  • +40741 578 752
  • office@ecoapa.ro
  • Romania, Bucharest, 88 Brăilița Street
  • Home
  • About Us
  • Projects
  • Contact

+40746 397 023
+40741 578 752
office@ecoapa.ro
Bucharest, 88 Brăilița Street

Support for the funding application and documentation for the water/wastewater infrastructure project in Vrancea, Stage III, 2021-2027
Support for the funding application and documentation for the water/wastewater infrastructure project in Vrancea, Stage III, 2021-2027

Support for the preparation of the funding application and tender documentation for the regional project for the development of water and wastewater infrastructure in Vrancea County – Stage III, during the 2021-2027 period


Value53,029,400.00 RON, excluding VATConsultantThe Association of Ramboll South East Europe & Ramboll Americas Engineering Solutions, Inc & Ecoapa Design SRL & Ramboll Danmark A/SBeneficiaryFocșani Public Utilities Company


Investments in water infrastructure for the localities in Vrancea County included in the project aimed at improving environmental quality and enhancing the living conditions of the population. Through the investments included in this project, the process of extending and rehabilitating the water infrastructure carried out during the 2014-2020 phase in urban areas continues, and investments are proposed for the extension and rehabilitation of water supply systems in rural areas and the establishment of water supply systems in rural areas that currently do not have a centralized water supply system.

Specific Objectives:

  1. Updating the Master Plan
  2. Studies required at the Feasibility Study (FS) phase: Hydrogeological studies; Geotechnical studies; Topographical studies; Assessments for utility works and structures and other necessary studies
  3. Complete feasibility study from a technical perspective (this will include: the technical part, general estimates and object estimates, economic-financial analysis, technical drawings, sludge strategy, industrial wastewater discharge study, institutional analysis, studies, assessments; documentation needed to obtain: environmental agreement/regulatory act issued by the competent environmental authority, ANAR approval, urbanism certificate, construction/demolition permits, approvals, and agreements, coordination plan approved by the involved authorities, funding application)
  4. Documentation required for obtaining the construction permit, permits/approvals for national roads, railways (if applicable), county roads (these will include the written part, the drawing part, and any approval/study necessary for project implementation)
  5. Funding application including supporting documents (supporting documents: final complete feasibility study, cost-benefit analysis, environmental impact assessment, institutional analysis, coordination plan adopted and approved by all involved authorities, approvals, agreements, etc.)
  6. Technical designs
  7. Tender documentation
  8. Report on the support activity in evaluating the Funding Application
  9. Organization of seminars/workshops and ensuring project publicity (includes: seminars/workshops to present the feasibility study to local authorities at certain stages and technical projects and publicity measures)
  10. Technical assistance from the designer during the implementation of the works contracts

Results:

  • Ensuring compliance with specific procedures established by the applicable legislation in force, both during the development and finalization of procurement documentation and throughout the procedure until contract signing;
  • Ensuring high-quality design in compliance with all current norms and standards;
  • Providing technical assistance from the designer throughout the entire project implementation period;
  • Preparation of tender documentation, technical projects, and execution details, in accordance with national legislation, for the works contracts within the project, in compliance with the funding application and the approved feasibility study;
  • The approved project promotes concrete measures of adaptability to climate change by building sustainable infrastructure;
  • The works contracts proposed within the Project are tendered in accordance with the project implementation schedule, with the Regional Operator benefiting from support during the tendering process;
  • Seminars to present the Feasibility Study;
  • Increasing the population’s connection rate to water and wastewater systems;
  • Ensuring the continuous and quality-compliant supply of water according to current norms to all localities included in the project.

Ecoapa

Home
About Us
Projects

Policies

Terms and Conditions
Privacy Policy
Cookie Policy

Contact

+40746 397 023   |   +40741 578 752
office@ecoapa.ro
Romania, Bucharest, 88 Brăilița Street


© 2024 Ecoapa Design SRL – All rights reserved – VAT No. RO35157017 – Trade Registry No. J40/12958/2015

We use cookies to ensure that we provide you with an optimal browsing experience on our website. Learn more about how we use cookies and how you can control them by clicking on "Privacy Preferences."

Privacy Preference Center

Privacy Preferences

When you visit a website, it may store or retrieve information through your browser, typically in the form of cookies. As we respect your right to privacy, you can choose not to allow data collection from certain types of services. However, disabling these services may impact your experience on the website.

Strictly necessary cookies

Required
Always active: These cookies are necessary for the website to function and cannot be turned off in our systems. They are typically set only in response to actions you take on the site, such as setting privacy preferences, logging in, or filling out forms. You can set your browser to block or alert you about these cookies, but some parts of the site will no longer function. These types of cookies do not store personally identifiable information.

Analytical cookies

These cookies allow us to count visits and traffic sources so that we can measure and improve the performance of our website. They help us identify which pages are the most and least popular and see how visitors move around the website. All information collected by these cookies is aggregated and, therefore, anonymous. If you do not allow these cookies, we will not know when you visited our website and will not be able to monitor its performance.

Advertising cookies

These cookies may be enabled on our website by our advertising partners. They may be used by these partner companies to build a profile of your interests and deliver relevant advertisements to you on other websites you visit. These cookies do not directly store personal information; instead, they rely solely on identifying your browser and the device you use to access the internet. If you do not allow these cookies, the advertisements you encounter will no longer be personalized.
Privacy Policy